References

Adjusting the gas boiler rooms

 
Customer:
Plzeňský Prazdroj, a.s.
Date of commissioning:
2016
Price:
4 055 000,- CZK

Equipment Water Management

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2016
Price:
3 610 000,- CZK

Modernization KB 11 - dust removal from coke I.

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2016
Price:
12 970 000,- CZK

Modernization KB 11 - dust removal from coke II.

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2016
Price:
12 970 000,- CZK

Modernization KB 11 - dust removal from coke III.

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2016
Price:
12 970 000,- CZK

Intensification of mixing sinterable mixture - Agglomeration 2

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2016
Price:
9 500 000,- CZK

Blinding blast furnace gas coking plant (at full operation)

 
Customer:
 
Date of commissioning:
2016
Price:
...,- CZK

Replacing furnace gas valves DN 2000 with gasometer

 
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2016
Price:
100 000,- CZK

Modernization KB 11 - ark

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2016
Price:
12 614 000,- CZK

Pipeline gaseous nitrogen to oxygen plant for STC furnaces

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2015
Price:
4 478 000,- CZK

Repair degassing valve

 
Customer:
Plzeňský Prazdroj, a.s.
Date of commissioning:
2015
Price:
125 000,- CZK

Divorces N2 and N3 in the production hall Mondelez CR Biscuit Opava

 
Customer:
Linde Gas a.s.
Date of commissioning:
2015
Price:
1 416 000,- CZK

Reconstruction suction loading device dispatch containers E3

 
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2015
Price:
431 000,- CZK

Changing the billing meters DN 1200 - EMĚ Mělník

 
Customer:
KROHNE CZ spol. s r.o.
Date of commissioning:
2015
Price:
577 000,- CZK

Interconnecting piping suction wells pump water station 3

 
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2015
Price:
571 500,- CZK

Installation of furnaces ŽDB Bohumín

 
Customer:
Strojírny a stavby Třinec, a.s.
Date of commissioning:
2015
Price:
777 500,- CZK

Installation of pipelines and natural gas boiler blast NK 14 (cost per job without material)

 
Customer:
SES Energy a.s.
Date of commissioning:
2014
Price:
5 990 000,- CZK

Steam line isolation for malting

 
Customer:
Plzeňský Prazdroj a.s.
Date of commissioning:
2014
Price:
952 000,- CZK

Pipeline distribution of media and sewerage

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2014
Price:
3 078 000,- CZK

Compensator

 
Customer:
locksmith shop
Date of commissioning:
2014
Price:
 

Extending the existing cooling circuit for the operation of TPD

 
Customer:
Strojírny a stavby Třinec, a.s.
Date of commissioning:
2014
Price:
1 690 000,- CZK

Reconstruction of the cooling circuit gas-treatment plant - Dorr no.1

 
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2014
Price:
32 327 000,- CZK

SO KKO

 
Customer:
 locksmith shop
Date of commissioning:
2013
Price:
 

Battery

 
Customer:
locksmith shop
Date of commissioning:
2013
Price:
 

Production of storage tanks DN 2000

 
Customer:
p. Karel Baron
Date of commissioning:
2013
Price:
153 000,- CZK

Replacing hot water and hot outdoor piping on site AWT Čechofracht, a.s.

 
Customer:
Keriani, a.s.
Date of commissioning:
2013
Price:
2 400 000,- CZK

Extending the existing cooling circuit for the operation of TPD

 
Customer:
Strojírny a stavby Třinec, a.s.
Date of commissioning:
2013
Price:
1 690 000,- CZK

Injection of pulverized coal in VP 4 and VP 6 - large pipe

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2013
Price:
8 154 000,- CZK

Injection of pulverized coal in VP 4 and VP 6 - small pipe

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2013
Price:
19 565 230,- CZK

Reconstruction of the cooling circuit gas-treatment plant - Dorr no.1

 
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2013
Price:
32 327 000,- CZK

Injection of pulverized coal

 
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2013
Price:
19 565 230,- CZK

 

Reconstruction of the three-way valve K2

Reconstruction of the three-way valve K2
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2013
Price:
20 799 000,- CZK

The stripping of benzene at coke

The stripping of benzene at coke
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2012
Price:
5 500 000,- CZK

Heating furnaces

Heating furnaces
Customer:
Pires s.r.o.
Date of commissioning:
2012
Price:
2 800 000,- CZK

Restoration of water supply for fire hydrants

Restoration of water supply for fire hydrants
Customer:
Sochorová válcovna TŽ, a.s.
Date of commissioning:
2011
Price:
6 300 000,- CZK

Changing the primary hot water piping

Changing the primary hot water piping
Customer:
BAEST Machinery Holding, a.s.
Date of commissioning:
2011
Price:
12 000 000,- CZK

Assembly and reconstruction waste gas heat exchanger of Continuous small-section mill

foto
Assembly and reconstruction waste gas heat exchanger of Continuous small-section mill
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2009
Price:
15 098 000,- CZK

Coke gas reduction station

foto
Coke gas reduction station
Customer:
EVi, a.s.
Date of commissioning:
2008
Price:
3 900 000,- CZK

Reconstruction of Blast-furnace slide valve

foto
Reconstruction of Blast-furnace slide valve
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2008
Price:
892 000,- CZK

Technology of iron desulphuration

foto
Technology of iron desulphuration
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2008
Price:
9 000 000 CZK

Converter steel plant- shifting of chimney including piping system

foto
Converter steel plant- shifting of chimney including piping system
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2008
Price:
5 200 000,- CZK

Garret coilers of Continuous small-section mill

foto
Garret coilers of Continuous small-section mill
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2008
Price:
15 100 000,- CZK

Revitalization of benzyl washer

foto
Revitalization of benzyl washer
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2008
Price:
17 933 000,- CZK

Cooling water DN 1200

foto
Cooling water DN 1200
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2008
Price:
1 400 000,- CZK

Agglomeration dusting off

foto
Agglomeration dusting off
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2007
Price:
6 500 000,- CZK

Bellows compensator manufacturing

foto
Bellows compensator manufacturing
Customer:
Kohaflex
Date of commissioning:
2007
Price:
390 000,- CZK

Blasting assembly manufacturing

foto
Blasting assembly manufacturing
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2007
Price:
1 100 000,- CZK

Flap valve production

foto
Flap valve production
Customer:
MMKV
Date of commissioning:
2006
Price:
265 000,- CZK

Dust skip jam

foto
Dust skip jam
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2005
Price:
2 600 000,- CZK

General repairing, Modernization and Reconstruction Blast Furnace No. 4

foto
General repairing, Modernization and Reconstruction Blast Furnace No. 4
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s. 
Termín
2005
Price:
16 300 000,- CZK

Compensating device 1200

foto
Compensating device 1200
Customer:
Kohaflex
Date of commissioning:
2004
Price:
1.200.000,- CZK

Assembling of engineering network - Industrial zone Baliny

foto
Assembling of engineering network - Industrial zone Baliny
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2004
Price:
2 500 000,- CZK

Bunker 480 m3

foto
Bunker 480 m3
Customer:
READYMIX ČR s.r.o
Date of commissioning:
2003
Price:
5 450 000,- CZK

Bunker 630 m3

foto
Bunker 630 m3
Customer:
READYMIX ČR s.r.o
Date of commissioning:
2003
Price:
10 800 000,- CZK

Continue casting small modernization Water piping DN 500 for Power distribution installation

foto
Continue casting small modernization Water piping DN 500 for Power distribution installation
Customer:
TŘINECKÉ ŽELEZÁRNY, a.s.
Date of commissioning:
2003
Price:
6 213 000,- CZK

Process module for GLAVERBEL CZECH Teplice

foto
Process module for GLAVERBEL CZECH Teplice
Customer:
AP Technologies s.r.o.
Date of commissioning:
2003
Price:
1 605 000,- CZK

Ash duct in powerplatn Dětmarovice

foto
Ash duct in powerplatn Dětmarovice
Customer:
Elektrárna Dětmarovice
Date of commissioning:
2003
Price:
1 890 000,- CZK

Store of natural calcium sulphate

foto
Store of natural calcium sulphate
Customer:
READYMIX ČR s.r.o
Date of commissioning:
2003
Price:
2 843 000,- CZK

Delivery and assembly input stream piping diameter 125 mm and condensation pipeline diameter 65 mm

foto
Delivery and assembly input stream piping diameter 125 mm and condensation pipeline diameter 65 mm
Customer:
LOBBE Dabrowa Górnicza
Date of commissioning:
2002
Price:
1 330 000,- CZK

Compensating pipe DN 2600 renewal And repair of butterfly valve DN 3000

foto
Compensating pipe DN 2600 renewal And repair of butterfly valve DN 3000
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2002
Price:
811 000,- CZK

Production and assembly of gas utilization technology for boiler K12

foto
Production and assembly of gas utilization technology for boiler K12
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2001
Price:
4 268 000,- CZK

Vizualization of TŽ, a.s.

foto
Vizualization of TŽ, a.s.
Customer:
ENERGETIKA TŘINEC, a.s.
Date of commissioning:
2000
Price:
850 000,- CZK
           


Polski English